Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 32 results ...

Aboukhadra, W (2021) Learning organisation, affective commitment and cultural intelligence: the case of expatriates in the Gulf Co-operation Council countries, Unpublished PhD Thesis, , Nottingham Trent University.

Adnan, H B (2004) Joint venture projects in Malaysian Construction Industry Factors Critical to success, Unpublished PhD Thesis, School of Property and Construction, Nottingham Trent University.

Agyekum-Mensah, G (2013) The development of an innovative sustainable total planning and control system for construction projects, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

Ahmed Namadi, S i (2019) A framework for collaborative costing in the UK construction industry, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

Alharbi, F (2020) Critical delay factors in housing construction projects in Saudi Arabia: Assessment and solutions, Unpublished PhD Thesis, , Nottingham Trent University.

Asnaashari, E (2011) A holistic conceptual model for managing construction logistics in building projects: the case of Iran, Unpublished PhD Thesis, School of Science and Technology, Nottingham Trent University.

  • Type: Thesis
  • Keywords: complexity; construction method; information management; interview; Iran; logistics; material management; purchasing; scheduling; site layout
  • ISBN/ISSN:
  • URL: http://irep.ntu.ac.uk/id/eprint/342/
  • Abstract:
    Logistics, as a factor that affects the total cost of a product, has attracted attention in many industries. However, construction is behind other industries, such as manufacturing and food, in terms of obtaining value through application of effective logistics management. Some specific characteristics of the construction industry, such as fragmented supply chain, indirect employment, temporary location and matchless products, have prevented organisations utilising logistic management in their projects. In construction, logistics is about the mobilisation of different types of resources to feed the project with the required materials and components at the right time, in the right place, right quantity and right quality. To do so, a new approach to construction logistics should be undertaken that respects the special characteristics of this industry. This research aims to develop a conceptual model based on the current practice of construction logistics in building projects. This model, in addition to complying with the special characteristics of the construction industry, is also adapted to the economic, cultural, technological and environmental specifications of the building sector in Iran. The complexity mindset is adopted in this research which allows considering a construction logistics system as a whole and the system may assert an aggregate behaviour. This approach is called holism and investigates the performance of complex adaptive systems. The study is focused on the Iranian construction industry as the main source of data collection. To achieve the aim and objectives of the research, a literature review was followed by qualitative and quantitative data collection. This research adopted the complementarity approach that uses qualitative and quantitative strategies in a way that complement each other. In the qualitative phase, twenty four open-ended interviews were conducted with construction practitioners who work in the building sector in Iran. Gathered data was analysed using NVivo. This involves codifying the textual data to find themes, categories and relationships. The results of the first phase were rich and exploratory and explained opinions, norms and attitudes. Based on the results of the first phase, a questionnaire with ten sections was designed to investigate different aspects of construction logistics from wider perspectives by conducting a survey on a large sample. The data gathered from the second phase were analysed in a descriptive manner to provide statistical information about the present practice of construction logistics in the Iranian building sector. The final product of this research is a holistic conceptual model that has four subsystems: (a) environmental factors (b) operational factors, (c) commercial factors, and (d) managerial factors. Each subsystem has several agents that are different functions of logistics in a building project. The environmental factors include project size and location, peak working seasons, resource conservation and weather conditions. The operational factors discuss technological matters, construction methods, new materials, waste and transportation. The commercial factors encompass the supply chain, finance, economic conditions, material costs, estimation, supplier selection, packaging, purchasing, inspection, and material quality. The managerial factors cover material management, warehousing, material handling, information management, scheduling, delivery, organisation, personnel, knowledge, culture and site layout designing. All of these functions are integrated under the topic of construction logistics model. The model also illustrates the relationships among agents of the system. The developed model, in addition to technical factors, has paid attention to soft factors such as culture, economy and knowledge. The model is adaptable to changing environments and elements may be added or deleted from the system whenever required.

Boyal-Seth, H (2011) Assessing the business case for supplier diversity in the construction housing sector, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

Coupar, G (2009) Modern approaches to repairs and maintenance procurement within the social housing sector, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

Daniel, E I (2017) Exploratory study into the use of Last Planner® System and collaborative planning for construction process improvement, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

Dowd, V G (1999) The pervading role of risk allocation as the link mechanism between factors of influence and construction procurement practices adopted in the UK construction industry over the period 1965-1995, Unpublished PhD Thesis, , Nottingham Trent University.

Dupin, P (2021) Using pull and flow systems to improve production stability in real estate development projects, Unpublished PhD Thesis, , Nottingham Trent University.

Grada, M (2007) The impact of economic value added measure in assessing the business performance of UK construction companies, Unpublished PhD Thesis, , Nottingham Trent University.

Hackett, V (2017) The impact of a collaborative planning approach on engineering construction performance, Unpublished PhD Thesis, , Nottingham Trent University.

Hamza, A (2002) Partnering in the construction industry: an empirical investigation into the critical success factors, Unpublished PhD Thesis, School of Property and Construction, Nottingham Trent University.

Hurst, A G (2009) Management education, training and development of construction managers: will they ever learn?, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

Idan, C K (2003) Quality function deployment (QFD) in the UK construction industry, Unpublished PhD Thesis, , Nottingham Trent University.

Jaafar, T (1992) A unified methodology for project planning risk, Unpublished PhD Thesis, , Nottingham Trent University.

Jackson, F (2006) Biodegradable hydraulic fluids: Reducing oil-related pollution in the construction industry, Unpublished PhD Thesis, , Nottingham Trent University.

Keats, R J (2014) An exploration of how professional associations advance innovation and promote innovation pedagogy, Unpublished PhD Thesis, , Nottingham Trent University.

Khadour, L (2010) Total quality environmental management framework towards sustainability (UK novated D&B principal contractors), Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

Khalid, U (2022) Investigation into the development of a human reliability analysis framework for the safety management of construction projects, Unpublished PhD Thesis, , Nottingham Trent University.

Kings, S (2002) Pricing documentation for contractors' estimators: Establishing a more effective approach, Unpublished PhD Thesis, , Nottingham Trent University.

McLean, M (2014) A longitudinal analysis of a partial mediation model of employee engagement in a knowledge-intensive firm, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

Musa, M M (2019) A framework for implementing target value delivery to enhance value creation in the construction industry, Unpublished PhD Thesis, , Nottingham Trent University.

Owen, K J (2002) Success factors in the procurement of privately financed tolled transportation infrastructure projects in the UK, Unpublished PhD Thesis, School of Property and Construction, Nottingham Trent University.

Payne, B (1998) Project risk analysis, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.

Pritchard, C (2005) Skin cancer prevention in the house building industry, Unpublished PhD Thesis, , Nottingham Trent University.

Rashid, K B A (1998) The processes of construction procurement in Malaysia: Identification of constraints and development of proposed strategies in the context of 'vision 2020', Unpublished PhD Thesis, , Nottingham Trent University.

Sarhan, S (2018) Institutional waste within the UK construction industry: an exploratory study, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.

Sharif, A (1996) A functional analysis of building procurement systems and strategies in an international context, Unpublished PhD Thesis, , Nottingham Trent University.

Taylor, M S (2021) Strategic management accounting practices in medium sized UK construction companies: a mixed-methods approach, Unpublished PhD Thesis, , Nottingham Trent University.

Ward, A D (2016) Development of a contextualised understanding of the diffusion of innovation among quantity surveyors in the UK construction industry, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.